Tour des Canadiens 3

Tour des Canadiens 3

Construction management
Montreal

Tour des Canadiens 3

Location

Montreal

Year

2020

Size

685000 sq. ft.

Delivery Method

Construction management

The
third phase of the famed residential Tour des Canadiens project, located just
south of the Bell Center, includes an all-glass 54 storey, 528,000 sq.ft. above
grade tower featuring 565 residential units. The building’s amenities of this
$150M project encompasses multiple party rooms, retail stores, a gym, a game
room, an indoor pool, a lounge, a spa and outdoor terraces, and an indoor
rooftop skylounge. The landscape components include not one, but two parks adjacent
to the tower – including a unique urban design for a pocket park with water
features on north and south sides.

TDC3_Nov2021_014-HR.jpg
TDC3_Nov2021_085-HR.jpg
TDC3_Nov2021_100-HR.jpg
TDC3_Nov2021_145-HR.jpg
TDC3_Nov2021_148-HR.jpg
TDC3_Nov2021_163-HR.jpg
TDC3_Nov2021_166-HR.jpg
TDC3_Nov2021_169-HR.jpg
TDC3_Nov2021_225-HR.jpg



,