Dynamite
Construction management
Mont-Royal
Dynamite
Location
Mont-Royal
Year
2014
Size
12000 sq. ft.
Delivery Method
Construction management
The project consisted of the construction of a
12,000 sf atrium and cafeteria space. The atrium is constructed of 13 parralam
wood arches supporting a high performance clear glass curtain wall system. The
curtain wall roof was designed to act as an expansion joint to take the
different movements of the two buildings that the atrium is bridging.