Sico

Sico

Design build mechanical Fixed price
Longueuil

Sico

Location

Longueuil

Year

2010

Size

203000 sq. ft.

Delivery Method

Design build mechanical Fixed price

This new 203,000 sf distribution center constructed for Akzo Nobel Sico was built on a fast track basis and completed in less than 5 months. The project was submitted as a candidate for LEED certification and included a TPO roof to reduce solar heat gain and nine solar wall panels used to pre-heat fresh air for the warehouse. Shipping areas included 29 dock-level doors including hydraulic levelers and one drive-in door.